In our last post we talked about the ATSSA “Tuesday Topics” webinar held June 27th. Joe Jeffrey began the webinar with a discussion of work zone ITS basics. Chris Brookes of Michigan DOT shared some of his lessons learned. The final speaker that day was Ross Sheckler of iCone there to talk about coming trends in work zone ITS. Ross declared that the next big thing will be queue warning combined with dynamic late merge.

Mr. Sheckler began by looking at the state of our industry. He said that nationally there are nearly 1,000 deployments per year now. Costs of these systems are dramatically lower than they once were. And the economy and simplicity of these systems have not affected their flexibility. In fact, because applications vary, flexibility always has been and always will be an important feature of work zone ITS.

And for that reason it is very easy to add features, including dynamic late merge. As Ross pointed out, queue warning systems have their limitations. When volumes increase and queue lengths extend beyond the limits of a queue warning system additional steps should be taken. By instructing drivers to stay in their lanes and take turns at the merge point, it reduces the overall queue length, makes the best use of limited capacity, reduces road rage, and sometimes can even improve throughout.

In his drawings of typical system configurations he listed 4 sensors and 1 portable changeable message sign (PCMS) for queue warning. For queue warning with dynamic late merge he added a second PCMS at the merge point to tell drivers to take turns and a fifth sensor to narrow the gap between sensors midway through the affected area. So, in total, just 1 more sensor and 1 more sign. This is a minimal added cost and significantly increases the capabilities of the system.

The message here is that we can often solve multiple problems with one system. It just takes a slightly different logic in the controlling software. In this case you can solve problems with end of queue crashes and conflicts at the merge point with one inexpensive, easy to use system. So please remember this the next time you specify a work zone ITS system. Consider all of the challenges you face on that project, and think about ways work zone ITS may mitigate one, two or perhaps even many of them.

This webinar covered a lot of ground in a very short time.  It was recorded and can be viewed by ATSSA members anytime at: http://www.atssa.com/TuesdayTopics/Recorded. Or watch for possible future webinars on this same topic.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s